We have exceptionally exceeded our client’s expectations over last 10 years performances of us by providing highly successful repairs (structural, non Structural) upgrading, reinstatements etc.. Range of unique experience we acquired is the key strength going forward. It’s been a special privilege to be technically qualified to perform certain highly ‘technical precision demanded’ projects by the world renowned port engineering consultants CGR-UK.
There are four major projects we have been involving for a span of last 9 years, these very large scale special restructuring, strength enhancement, Structure life extending repair projects have been performed to its utmost quality and the performances. Main expectation of the project was to enhance performance ability of the wharf to next 30 years and beyond. Client was the No. 1 port terminal for best productivity in South Asia and world No. 4 for that of in 2015. Consultant was world’s No.1 Port consultants CGE-UK.
Three major projects are already completed, and the fourth is halfway. Each projects lasted slightly over two years. More importantly there were no obstructions to yard operations at all.
First major project Completed was one of the world’s largest marine steel pile corrosion control project, completed in 2016. It includes 1000Nos 1m diameter Wharf pile thickness survey and fixixng of 1000 Nos. Corrosion control Retrowraps. Material purchased from CCI (Corrosion Control International)- And we thankfully recall NORDEA bank and FINNVERA cooperation Finland for their trust kept on us by financing for material purchasing, it was a highly successful project. We are an accredited agent for supply and application of CCI products internationally, our diving teams are well trained and connected with international teams to perform jobs at any part of the world.
Also we are much obliged and proud that we have been able to complete arguably the world’s largest wharf slab crack repair project to its maximum quality. It’s a mammoth 1km long 500mm thick wharf slab with certain cracks emerged on the soffit. All cracks were to surface sealed and to injected with a special chemical. Project duration was 3 years completed in 2020. Performances have been highly loaded by the client and the consultant CGR-UK. Purchased Chemicals from BASF. We collaborate, are trained and authorized as an accredited supply and applicator of BASF product internationally.
3rd and 4th Projects are in similar nature, 3rd –the headstock beams strengthening and life span extending repair project, 90% is completed and the 4th Permanent Repairs to RCC Main Crane Beam, Structural repairs for over 1.4Km. s to be completed in the 2023.This anticipate longevity of the Wharf blab and the main crane beams for its best performances in many years to come. This helps enable unfaltering continuation of Terminals operation for next thirty years. Special Micro Concrete material purchased from BASF.