Projects details

Permanent Repairs to RCC Main Crane Beam, Structural repairs for over 1.4Km

Certified Company ISO 9001-2008
  • Client/ Location :
    SAGT, Port of Colombo
  • Year(s) performed :
    2022 to 2023. Ongoing 20% of the project successfully completed
  • Project Consultant :
    CGR (UK)
  •  
  • More details are available at your exclusive request.

Project Description

This anticipate longevity of the Wharf blab and the main crane beams for its best performances in many years to come. This helps enable unfaltering continuation of Terminals operation for next thirty years. Condition Survey detailed reports were to produced for record proposes and high pressure water blast concrete breaking methods used for breaking concrete non destructively after removal of spelled concrete using manual method and minor tools. Special structural reinforcement replacements is fixed afterward with Zn Rich primer coated. Micro Concrete is then poured in the sealed Form Work Fixed to suit the repair needed. All work is executed at no impediment to ongoing yard terminal work.